Berlangganan

RSS Feed (xml)

Powered By


Powered by Blogger

SITE PREVIEW

This site is not only dedicated to a proffesor in accounting but also to many people who have interest in accounting. It discuss about accounting, especially hospital accounting and the other related topics.

As far as we know, hospital management use the financial report produced by accounting. Management have to plan, organizing, act, and controll the hospital business. He must be well understands about management and of course accouting.

The magic of accounting can solve all the problem that occurs. But accounting is not a single player. It needs the other tools, like audit that performs any kind of audit, management that manage not only the main business but also the second business, excitre.

In fact we hope can help somebody who have difficulty in accounting. You are right when say: this site has not perfect. We agree with you. So we call you to contribute your best opinion and thinking in accounting to make this site as one of choices discusing places.

Thanks for joining this site.

Selasa, 12 Agustus 2008

The New Method Of Unit Cost : Activity Based Costing

Activity based costing (ABC) assigns manufacturing overhead costs to products in a more logical manner than the traditional approach of simply allocating costs on the basis of machine hours. Activity based costing first assigns costs to the activities that are the real cause of the overhead. It then assigns the cost of those activities only to the products that are actually demanding the activities.


Let's discuss activity based costing by looking at two products manufactured by the same company. Product 124 is a low volume item which requires certain activities such as special engineering, additional testing, and many machine setups because it is ordered in small quantities. A similar product, Product 366, is a high volume product—running continuously—and requires little attention and no special activities. If this company used traditional costing, it might allocate or "spread" all of its overhead to products based on the number of machine hours. This will result in little overhead cost allocated to Product 124, because it did not have many machine hours. However, it did demand lots of engineering, testing, and setup activities. In contrast, Product 366 will be allocated an enormous amount of overhead (due to all those machine hours), but it demanded little overhead activity. The result will be a miscalculation of each product's true cost of manufacturing overhead. Activity based costing will overcome this shortcoming by assigning overhead on more than the one activity, running the machine.


Activity based costing recognizes that the special engineering, special testing, machine setups, and others are activities that cause costs-they cause the company to consume resources. Under ABC, the company will calculate the cost of the resources used in each of these activities. Next, the cost of each of these activities will be assigned only to the products that demanded the activities. In our example, Product 124 will be assigned some of the company's costs of special engineering, special testing, and machine setup. Other products that use any of these activities will also be assigned some of their costs. Product 366 will not be assigned any cost of special engineering or special testing, and it will be assigned only a small amount of machine setup.